This Glencoe, IL landscape project focused on creating a dedicated and durable playground area around a new swing set. The work was planned in two phases to coordinate with the swing set installation, beginning with preparation of the designated play area and followed by the installation of rubber mulch once the swing set was in place. The project also included preliminary planning for potential future drainage improvements, with the drainage needs to be reassessed after completion of the new play area.
Project Goals
- Prepare approximately 220 square feet for the new playground area.
- Remove the existing sod from the designated play space.
- Grade the area to help prevent centralized water pooling.
- Define the playground perimeter with pressure-treated landscape timbers.
- Install landscape fabric beneath the playground surface.
- Return after swing set installation to complete the rubber mulch installation.
- Establish an approximately 4-inch finished depth of rubber mulch.
- Evaluate future drainage needs after the new play area has been installed.
Phase 1: Playground Area Preparation
The first phase of the project focused on preparing the designated playground area before the swing set installation. Approximately 220 square feet of existing sod was removed from the marked play area, clearing the space for grading and installation of the playground base materials.
The area was then graded to help prevent water from collecting in the center of the playground. Establishing appropriate grading before installing the finished playground surface helps create a more functional and maintainable play space.
Pressure-Treated Landscape Timber Border
Approximately 66 linear feet of 6-inch by 6-inch pressure-treated landscape timbers were installed around the perimeter of the playground area. The timbers define the boundaries of the play space while helping contain the playground surface within the designated area.
The defined perimeter also creates a clean transition between the playground and the surrounding landscape.
Landscape Fabric Installation
After the area was prepared and bordered, approximately 220 square feet of durable landscape fabric was installed throughout the playground area. The fabric provides a separation layer beneath the finished rubber mulch while helping maintain a defined playground surface.
Installing the fabric across the prepared area also helps create a consistent base for the rubber mulch that would be installed during the second phase.
Phase 2: Rubber Mulch Installation
The second phase was scheduled to take place after the swing set had been installed. Once the play equipment was in position, the team would return to supply and spread rubber mulch throughout the approximately 220-square-foot playground area.
The rubber mulch was planned to reach an approximately 4-inch finished depth across the play area. After installation, the material would be raked and leveled to create a clean and even finished surface around the swing set.
Future Drainage Planning
In addition to the playground installation, the client and designer reviewed and developed a preliminary plan for potential future drainage improvements. Measurements were taken during the planning process to help evaluate the property’s existing drainage conditions.
Because the new playground area and its grading could affect water flow, the drainage plan will be reassessed after the play area has been completed. Final drainage recommendations and any future scope of work will be determined following this reassessment.
Why Proper Playground Preparation Matters
A properly prepared playground area provides a defined space for play while helping the surface remain organized and easier to maintain. Removing existing sod, addressing grading, installing a perimeter border, and placing landscape fabric create the foundation for the finished rubber mulch surface.
Coordinating the work around the swing set installation also allows the finished mulch surface to be installed after the play equipment is in place, providing consistent coverage throughout the designated play area.
Project Highlights
- Prepared approximately 220 square feet for a new residential playground area.
- Removed existing sod from the designated play space.
- Graded the area to help prevent centralized pooling.
- Installed approximately 66 linear feet of 6″ × 6″ pressure-treated landscape timbers.
- Installed approximately 220 square feet of durable landscape fabric.
- Planned rubber mulch installation at an approximately 4-inch finished depth.
- Coordinated the project in two phases around swing set installation.
- Raked and leveled the rubber mulch for an even finished surface.
- Developed preliminary plans for potential future drainage improvements.
- Planned a post-installation drainage reassessment based on the completed play area’s effect on grading and water flow.
As you browse through the photos, you can see the preparation of the designated playground area, including the removal of existing sod, grading, landscape timber installation, and placement of landscape fabric. The project was carefully coordinated around the installation of the new swing set so the final rubber mulch could be installed once the equipment was in place.
The completed playground area provides a clearly defined space with a durable rubber mulch surface, while the additional drainage planning allows the property’s water flow to be evaluated again after the new play area is established.
Please call 847.698.6868 or Contact Us
Tommy Pollina Landscape Company – serving Chicagoland since 1982.
Landscaping Services
- Emergency / Expedited Drainage
- Drainage
- Sump Pump Solutions
- Basement Waterproofing
- Grading and Regrading
- Landscape Design
- Landscape Installations, Plantings
- Lawn Maintenance
- Spring Cleanup
- Stump Grinding
- Tree Triming, Tree Removal, Stump Grinding
- Artificial Turf Installations
- Pool Removal
- Planters
- Irrigation and Sprinkler System
- Seasonal Planter, Potted Plants
- Cemetery Management
- Outdoor Design & Build: Full Outsource Project
- Custom Putting Greens
- Summer Makeover
- Trimming & Pruning
- Lighting
- Mulch
- Waterscaping
- Fall Plantings
- Fall Cleanup
- Seasonal Color: Fall and Holiday
- Holiday Decor, Holiday Lighting
- Snow and Ice Management
Featured Landscaping Projects
- Planting Flowers – Lanscaping Project in Kenilworth
- Emergency Drainage & Grading Fix Project in Northfield Township / Glenview
- Evanston Backyard Outdoor Kitchen and Chimney Construction with Stucco and Lannon Stone Features
- Park Ridge Backyard Privacy Landscaping with Emerald Green Arborvitae and Fence Line Planting
- Niles Backyard Drainage, Excavation & Fence Installation Project
- Foundation Grading and Drainage Improvement Project in Winnetka
- Concrete Hardscape and Landscape Renovation Project in Inverness, IL with Patio and Retaining Wall
- Backyard Drainage System and Grading Improvements Project in Des Plaines
- Southeast Downspout Drainage Installation in Lake Bluff, IL
- Trimming and Pruning Service – Project in Wilmette
- Wilmette Design Build Hardscape Renovation with Unilock Pavers, Custom Railings, and Integrated Drainage
- Park Ridge double-lot landscape installation project
- Custom Holiday Winter Container Pot Installation Project in Glenview
- Landscape Planting and Privacy Screening Installation Project in Wilmette
- Sump Pump Flow Well Drainage Project in Arlington Heights, IL for Improved Water Management
- Drainage System and Side Yard Grading Project in Harwood Heights, IL
- Fall Planter Planting & Seasonal Flower Installation in Arlington Heights, IL
- Drainage Landscaping Project in Northbrook
- Planting-Bed Landscape Installation Project in Winnetka
- Evanston custom outdoor kitchen island construction project
- Lincoln Park Garage Drainage Project with Nds-Channel Drain
- Chicago Foundation Drainage and Swale Grading Project
- Driveway, Walkway, and Patio Hardscape Restoration Project in Glencoe
- Bush Trimming, Tree Pruning, and Landscape Cleanup Project in Glenview, IL
- Drainage System and Retaining Wall Installation in Prospect Heights, IL
- Landscape Edging, Rock Border & Berm Installation in Arlington Heights
- Drainage Landscaping Project in Lake Forest
- Wilmette New Construction Landscaping with Bluestone Porch, Unilock Pavers, Deck, Sod, Irrigation, and Drainage Systems
- Wilmette arborvitae wall project with layered shrubs, trees, privacy, curb appeal, and integrated landscaping
- Lake Zurich outdoor enhancement and planting project
- Park Ridge Front Staircase and Walkway Restoration Project
- Chicago Backyard Privacy Landscaping Project with Arborvitaes & Evergreens
- Sump Pump Discharge Extension and Drainage Improvement Project in Mount Prospect
- Brick Step Repair and Loose Brick Restoration Project in Wheeling
- Drainage project in Schiller Park, IL with 6-inch PVC piping, downspout connections, French drain, and river rock drainage system.
- Starting a New Drainage Project in the City of Des Plaines
- Brick Driveway Channel Drain Project in the Village of Riverwoods
- Schaumburg driveway reconstruction project with asphalt, concrete, Geo Grid, retaining wall, NDS drainage, and brick borders
- Park Ridge Landscape Lighting Installation Project
- Park Ridge Drainage System Replacement Project – Foundation Flooding Repair and PVC Regrading Solution
- Landscape Renovation and Plant Installation Project in Winnetka
- Front Entrance Brick Stair Repair Project in Buffalo Grove, IL
- Downspout Drainage System Installation in Buffalo Grove, IL
- Arborvitae Planting, Garden Bed & Drainage Extension in Chicago